The attached jpeg, ‘Ref 1101 Construction’ is a sketch illustrating the main pieces of power and control equipment and where they are likely to be positioned.
A – Main Control Cabinet
B – Compressed Air Power Pack
C – Compressed Air Service Module
D – Special Water Pump – with no-moving parts (more on this later)
E – Telescopic Moisture Tower
F – Electro-Mechanical Drive & Positioning Unit
G – Water Heater
H – Hydro-Energy Unit
I – Solar Panel
J – Energy Storage Battery
Items notated 1, 2, 3 & 4 relate to the four levels of Construction, the four stages of the Telescopic Moisture Tower and the respective position sensing Micro-Switches.
Not shown on this sketch are the sensors to measure and record Lighting, Temperature, Humidity, Water/Moisture.
See jpeg, ‘Ref 1101 Construction’
1meterofpi raspberry_pi, design challenge, raspberry pi 4 2gb, 1 meter of pi, 1_meter_of_pi, 1 meter of pi - design challenge

Top Comments
-
DAB
-
Cancel
-
Vote Up
+1
Vote Down
-
-
Sign in to reply
-
More
-
Cancel
Comment-
DAB
-
Cancel
-
Vote Up
+1
Vote Down
-
-
Sign in to reply
-
More
-
Cancel
Children