element14 Community
element14 Community
    Register Log In
  • Site
  • Search
  • Log In Register
  • Community Hub
    Community Hub
    • What's New on element14
    • Feedback and Support
    • Benefits of Membership
    • Personal Blogs
    • Members Area
    • Achievement Levels
  • Learn
    Learn
    • Ask an Expert
    • eBooks
    • element14 presents
    • Learning Center
    • Tech Spotlight
    • STEM Academy
    • Webinars, Training and Events
    • Learning Groups
  • Technologies
    Technologies
    • 3D Printing
    • FPGA
    • Industrial Automation
    • Internet of Things
    • Power & Energy
    • Sensors
    • Technology Groups
  • Challenges & Projects
    Challenges & Projects
    • Design Challenges
    • element14 presents Projects
    • Project14
    • Arduino Projects
    • Raspberry Pi Projects
    • Project Groups
  • Products
    Products
    • Arduino
    • Avnet Boards Community
    • Dev Tools
    • Manufacturers
    • Multicomp Pro
    • Product Groups
    • Raspberry Pi
    • RoadTests & Reviews
  • Store
    Store
    • Visit Your Store
    • Choose another store...
      • Europe
      •  Austria (German)
      •  Belgium (Dutch, French)
      •  Bulgaria (Bulgarian)
      •  Czech Republic (Czech)
      •  Denmark (Danish)
      •  Estonia (Estonian)
      •  Finland (Finnish)
      •  France (French)
      •  Germany (German)
      •  Hungary (Hungarian)
      •  Ireland
      •  Israel
      •  Italy (Italian)
      •  Latvia (Latvian)
      •  
      •  Lithuania (Lithuanian)
      •  Netherlands (Dutch)
      •  Norway (Norwegian)
      •  Poland (Polish)
      •  Portugal (Portuguese)
      •  Romania (Romanian)
      •  Russia (Russian)
      •  Slovakia (Slovak)
      •  Slovenia (Slovenian)
      •  Spain (Spanish)
      •  Sweden (Swedish)
      •  Switzerland(German, French)
      •  Turkey (Turkish)
      •  United Kingdom
      • Asia Pacific
      •  Australia
      •  China
      •  Hong Kong
      •  India
      •  Korea (Korean)
      •  Malaysia
      •  New Zealand
      •  Philippines
      •  Singapore
      •  Taiwan
      •  Thailand (Thai)
      • Americas
      •  Brazil (Portuguese)
      •  Canada
      •  Mexico (Spanish)
      •  United States
      Can't find the country/region you're looking for? Visit our export site or find a local distributor.
  • Translate
  • Profile
  • Settings
Power & Energy
  • Technologies
  • More
Power & Energy
Forum New Submarine Power Cable for Wind Farms -- Worth It???
  • Blog
  • Forum
  • Quiz
  • Documents
  • Polls
  • Events
  • Mentions
  • Sub-Groups
  • Tags
  • More
  • Cancel
  • New
Actions
  • Share
  • More
  • Cancel
Forum Thread Details
  • State Not Answered
  • Replies 0 replies
  • Subscribers 285 subscribers
  • Views 195 views
  • Users 0 members are here
  • alternative_energy
  • wind
  • Alternative Energy Tags
  • grid
  • energy
Related

New Submarine Power Cable for Wind Farms -- Worth It???

DaveYoung
DaveYoung over 14 years ago

The NYT recently reported on new plans to lay a new submarine cable designed to carry 6GW of wind power from as far as 20 miles offshore to the grid along the East Coast.  The idea of producing clean power out of sight and further from bird sanctuaries is creating quite a buzz.  Read the full article here.

 

I began to wonder what the extra cost this cable will put on a technology that is pushing as hard as it can to lower its all-important $/KWh figure.  After all, even with all of Google's successes they are not above failure (c'mon, when was the last time you logged into google wave?).

 

Just to put some rough numbers together:

$5B in estimated cost to get the cable up and running. Let's add another 15% in extra costs such as permits, cost of capital, maintenance, budget overruns, dirty politician bribes 'campaign contributions', etc... to make a total cost of $5.75B

 

6GW in rated production.  Of course the wind is not so kind as to blow around the clock, therefore the cable will not always transmit at the rated 6GW.  According to Wikipedia, a good capacity factor estimate would be 40% giving a time-average-output of 2.4GW.

 

If based on the expected service life of the electrical cable connecting Connecticut to Long Island Sound, one can expect a service life of 40 years.  That makes for a total of 350,400 service hours.

 

Dividing $5.75B by 2.4GW gives $2,395 per KW.  Divide the cost per KW by the number of service hours, and you find a total cost of $0.00595 per KWh.

 

A little more than half a cent, if I have my numbers right.  What do you think?  Think it'll happen?  Is it worth it?  Would you pay the premium to put the wind farm far offshore instead of on the hill behind your house?  Am I totally off my rocker with this over-simplified, Internet-search-based calculation?

 

Dave Young

  • Sign in to reply
  • Cancel
element14 Community

element14 is the first online community specifically for engineers. Connect with your peers and get expert answers to your questions.

  • Members
  • Learn
  • Technologies
  • Challenges & Projects
  • Products
  • Store
  • About Us
  • Feedback & Support
  • FAQs
  • Terms of Use
  • Privacy Policy
  • Legal and Copyright Notices
  • Sitemap
  • Cookies

An Avnet Company © 2025 Premier Farnell Limited. All Rights Reserved.

Premier Farnell Ltd, registered in England and Wales (no 00876412), registered office: Farnell House, Forge Lane, Leeds LS12 2NE.

ICP 备案号 10220084.

Follow element14

  • X
  • Facebook
  • linkedin
  • YouTube