Not posted for a few months, have been busy with a number of things such as visiting Ireland and Scotland, attending EMF camp, painting the house and show casing the company's new products as a fashion model.
But there has been progress on tbe Workshopshed.
Since installing the trusses and boards for the roof, I added a waterproof membrane and nailed on over 600 tiles.

Following that extra floor battens were installed all round, along with a board to form the start of the walls.
Uprights were added along with a door frame.

OSB was attached to the frame and wrapped with more membrane.
Have just started adding cladding. I hope to get that all on before the weather gets much worse.


Was hoping "to be in by Christmas" but that's not looking too hopeful.