I am using Eagle Pro 5.11 to place 6mil vias with 12 mil pads onto a GND polygon. The vias are named GND as well. This works well.
However, DRC complains about a DRILL CLEARANCE issue. I have tried reducing the DRC-CLEARANCE-VIA-VIA and VIA-SMD down to 1mil to no avail.
Is there another location where I should change the DRC rules for drill clearances?
Billy