I have two version of a design. V0 and V1. They are originally
identical. The number and type of all components is the same. Routing is
different.
V0 is in production and during tests some values have changed.
V1 is not yet in production. The routing has been improved.
How do copy the chenged values from V0 to V1?
THanks.