element14 Community
element14 Community
    Register Log In
  • Site
  • Search
  • Log In Register
  • Community Hub
    Community Hub
    • What's New on element14
    • Feedback and Support
    • Benefits of Membership
    • Personal Blogs
    • Members Area
    • Achievement Levels
  • Learn
    Learn
    • Ask an Expert
    • eBooks
    • element14 presents
    • Learning Center
    • Tech Spotlight
    • STEM Academy
    • Webinars, Training and Events
    • Learning Groups
  • Technologies
    Technologies
    • 3D Printing
    • FPGA
    • Industrial Automation
    • Internet of Things
    • Power & Energy
    • Sensors
    • Technology Groups
  • Challenges & Projects
    Challenges & Projects
    • Design Challenges
    • element14 presents Projects
    • Project14
    • Arduino Projects
    • Raspberry Pi Projects
    • Project Groups
  • Products
    Products
    • Arduino
    • Avnet & Tria Boards Community
    • Dev Tools
    • Manufacturers
    • Multicomp Pro
    • Product Groups
    • Raspberry Pi
    • RoadTests & Reviews
  • About Us
    About the element14 Community
  • Store
    Store
    • Visit Your Store
    • Choose another store...
      • Europe
      •  Austria (German)
      •  Belgium (Dutch, French)
      •  Bulgaria (Bulgarian)
      •  Czech Republic (Czech)
      •  Denmark (Danish)
      •  Estonia (Estonian)
      •  Finland (Finnish)
      •  France (French)
      •  Germany (German)
      •  Hungary (Hungarian)
      •  Ireland
      •  Israel
      •  Italy (Italian)
      •  Latvia (Latvian)
      •  
      •  Lithuania (Lithuanian)
      •  Netherlands (Dutch)
      •  Norway (Norwegian)
      •  Poland (Polish)
      •  Portugal (Portuguese)
      •  Romania (Romanian)
      •  Russia (Russian)
      •  Slovakia (Slovak)
      •  Slovenia (Slovenian)
      •  Spain (Spanish)
      •  Sweden (Swedish)
      •  Switzerland(German, French)
      •  Turkey (Turkish)
      •  United Kingdom
      • Asia Pacific
      •  Australia
      •  China
      •  Hong Kong
      •  India
      •  Japan
      •  Korea (Korean)
      •  Malaysia
      •  New Zealand
      •  Philippines
      •  Singapore
      •  Taiwan
      •  Thailand (Thai)
      •  Vietnam
      • Americas
      •  Brazil (Portuguese)
      •  Canada
      •  Mexico (Spanish)
      •  United States
      Can't find the country/region you're looking for? Visit our export site or find a local distributor.
  • Translate
  • Profile
  • Settings
Raspberry Pi
  • Products
  • More
Raspberry Pi
Raspberry Pi Forum new RPi model B planned soon
  • Blog
  • Forum
  • Documents
  • Quiz
  • Events
  • Polls
  • Files
  • Members
  • Mentions
  • Sub-Groups
  • Tags
  • More
  • Cancel
  • New
Join Raspberry Pi to participate - click to join for free!
Featured Articles
Announcing Pi
Technical Specifications
Raspberry Pi FAQs
Win a Pi
Raspberry Pi Wishlist
Actions
  • Share
  • More
  • Cancel
Forum Thread Details
  • Replies 70 replies
  • Subscribers 691 subscribers
  • Views 5054 views
  • Users 0 members are here
  • raspberry_pi
Related

new RPi model B planned soon

Former Member
Former Member over 13 years ago

http://www.raspberrypi.org/phpBB3/viewtopic.php?f=63&t=23600&start=3

 

Maybe it will fix the USB hot plug problem.

Maybe it will fix the residential CE/FCC compliance issue.

no actual information available.

 

Six days ago, JamesH wrote:

"AFAIK there will be no change to the Raspi (overall - so same SoC, same memory etc) in the next year. There will be changes in SW though, but that is a simple upgrade."

http://www.raspberrypi.org/phpBB3/viewtopic.php?f=23&t=23131&start=1

 

There seems to be a pattern that new hardware revisions are released shortly after JamesH says they won't be.

 

Model A's planned for March.

http://www.raspberrypi.org/phpBB3/viewtopic.php?f=2&t=3225&start=7

  • Sign in to reply
  • Cancel
Parents
  • morgaine
    morgaine over 13 years ago

    If the Model A is planned for March 2013, then RPF's banner headline will have declared the Pi as the $25 computer for a whole year by then.  Isn't there a law against such blatant long-term false advertising?

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • johnbeetem
    johnbeetem over 13 years ago in reply to morgaine

    Morgaine Dinova wrote:

     

    If the Model A is planned for March 2013, then RPF's banner headline will have declared the Pi as the $25 computer for a whole year by then.  Isn't there a law against such blatant long-term false advertising?

    coder27 is being gamesome.  The link is to a 20 Feb 2012 comment where liz promises that "you'll definitely be able to buy Model As in March".  True, she doesn't specify the year.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • Former Member
    Former Member over 13 years ago in reply to morgaine

    Morgaine Dinova wrote:

     

    As usual the fanbois tried to deny everything and paint RS as the guilty party, but coder27's links above make the situation clear.  Not even RPF can obtain more SoCs for Model A, every one produced reduces the number of BCM2835 parts for Model B.  The posts indicate that the restrictions are entirely at Broadcom's end.

     

     

    Why are you talking as if the RPF has anything to do with the purchasing and distributing of the SoCs?  It's a very well know fact that they have 100% outsourced the production of the device to Farnell and RS.  Liz says "we" but knowing they don't actually produce the device, it would stand to reason that she is speaking for the business partners; something she's done often.  With a 30 week lead time, not purchasing enough SoCs would result in some crappy results like about 7 months of constantly running out of supplies because you didn't anticipate demand.  We've discussed this before, you certainly know a lot about general things and electronics, but you are out of your zone of knowledge when it comes to real life fabrication environments.  Not that I mean to absolve B-com from all responsibility here but RS started having backlog issues well within 7 months of the pi being released.  With the firm fact that there's a 30 week lead time for the SoC, it would be impossible for the problem too have been on B-com's end as all they were doing was filling the demand that RS had already requested.

     

    Edit: Also the comment would seem to indicate that the parts being reduced by making model As is referring to the parts on hand, which again would be an issue of the one populating the board purchasing a large enough supply 7 months ago and not a matter of B-com not making enough SoCs today.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • morgaine
    morgaine over 13 years ago in reply to Former Member

    You are completely missing the point.  RPF has said clear as daylight that every Model A that could be produced would result in one less Model B being produced.  Who orders what is irrelevant.  Not enough BCM2835 devices are being produced by Broadcom, period.

     

    If you are trying to suggest that Broadcom would deliberately switch a fab line off BCM2835 devices or run it at less than full capacity despite knowing full well that the Pi is back-ordered around the world then you are painting Broadcom as incompetent and deliberately holding back the Pi ecosystem and not being interested in selling product.   After all they know with 100% certainty that every BCM2835 manufactured would be sold tomorrow if it were available.  I find it incredible that anyone would think Broadcom is that stupid and willfully losing out on revenue.  The mind boggles.

     

    So no, no, no, no.  The scarcity has absolutely nothing to do with poor order planning by one partner, because that wouldn't alter the picture even if it were true (and indeed it might be true, I'm not saying it's not, but only that it's irrelevant).  You're listening too much to RPF excuses (which you should realize operate very much as an arm of Broadcom) and not thinking about what your interpretation would say about Broadcom's commercial interest.  They are in this to make money.  If they're not printing money by churning out chips faster than they are now when they know full well that they could sell every one instantly, then you can be certain that it has nothing to do with missing paperwork.  The only answer that makes commercial sense is that they don't have any more capacity.

     

    Morgaine.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • Former Member
    Former Member over 13 years ago in reply to morgaine

    Morgaine Dinova wrote:

     

    You are completely missing the point.  RPF has said clear as daylight that every Model A that could be produced would result in one less Model B being produced.  Who orders what is irrelevant.  Not enough BCM2835 devices are being produced by Broadcom, period.

     

    If you are trying to suggest that Broadcom would deliberately switch a fab line off BCM2835 devices or run it at less than full capacity despite knowing full well that the Pi is back-ordered around the world then you are painting Broadcom as incompetent and deliberately holding back the Pi ecosystem and not being interested in selling product.   After all they know with 100% certainty that every BCM2835 manufactured would be sold tomorrow if it were available.  I find it incredible that anyone would think Broadcom is that stupid and willfully losing out on revenue.  The mind boggles.

     

    So no, no, no, no.  The scarcity has absolutely nothing to do with poor order planning by one partner, because that wouldn't alter the picture even if it were true (and indeed it might be true, I'm not saying it's not, but only that it's irrelevant).  You're listening too much to RPF excuses (which you should realize operate very much as an arm of Broadcom) and not thinking about what your interpretation would say about Broadcom's commercial interest.  They are in this to make money.  If they're not printing money by churning out chips faster than they are now when they know full well that they could sell every one instantly, then you can be certain that it has nothing to do with missing paperwork.  The only answer that makes commercial sense is that they don't have any more capacity.

     

    Morgaine.

     

    Again, we've discussed this before but I'll say it again.  That's not how fabrication works.  There is not a single line dedicated to each chip.  You'll have a line for each genre of devices (hard drive platters, CPU, etc), but you will not have a "BCM2835" line.  This is why they have such a high production time.  You schedule a period of time to produce a specific chip in, once its turn is done you move to the next.  B-com like any other fab out there will build only to meet what has been ordered, and while that might mean they build a little extra to fill out the line, odds are they have an order increment that forces the customer to fill the line.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • Former Member
    Former Member over 13 years ago in reply to morgaine

    I'll also would like to point out again that the product availability being dicussed by Liz would quite logically being the amount they have in hand, a quantity that would have been ordered 7 months ago by the respective distributor and has nothing to do with how quickly or how much b-com could produce with an order placed today.  B-com isn't going to stop manufacture of its other chips just to alter an order for this "low cost" chip to meet the demand for it within the Rpi community.  That's just bad business practice.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • morgaine
    morgaine over 13 years ago in reply to Former Member

    I'm afraid what you say doesn't make commercial sense for Broadcom nor for RS nor for RPF, so I don't believe it holds water.  But let me try a completely different tack to demonstrate that your explanation just doesn't work.

     

    Let's assume just for a moment that Broadcom has a mind of its own and is not just a fab contract house as you make it out to be.  Let's say that they have their eyes open and notice that the demand for BCM2835 is huge and that there is zero risk associated with producing devices not to order but for buffer stock.  And let's assume that they did so.

     

    Now, assuming that this happened, what would be the result of Broadcom's sales department picking up the phone and dialing RS's number and saying "Oh RS, guess what, we have the N devices that you wished you had ordered 500 years ago in stock, do you want them?"  (There could even be a small markup over and above contract order pricing.)

     

    Now don't tell me that you think RS would say "Nah, not interested mate.  We're totally happy having our reputation dragged through the mud like it is now thanks, we'll talk to you again in mid-2013 for our next batch."

     

    It would stretch incredulity, so I can't believe that there is any possibility at all of such a response.  RS would love to slash its waiting lists to nil overnight if it could, and it would if given half a chance.  RS would win, Broadcom would win (through slightly more profit for them and a happier Pi ecosystem), and RPF would win massively by Model A not being delayed by the SoC shortage and by being able to strut around with a big smiles on their faces after proclaiming "No more delivery queues anywhere, order freely now."

     

    When everybody would win in this picture, why theorize that Broadcom is totally inept in business and thwarted by some missing paperwork?  It just doesn't make sense.

     

    I'm not often on the side of Broadcom because of their total dislike of openess, but I do believe that they have the business sense to print money when that option is available to them.  And it is.

     

    Morgaine.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • Former Member
    Former Member over 13 years ago in reply to morgaine

    Morgaine Dinova wrote:

     

    I'm afraid what you say doesn't make commercial sense for Broadcom nor for RS nor for RPF, so I don't believe it holds water.  But let me try a completely different tack to demonstrate that your explanation just doesn't work.

     

    Let's just assume for a moment that Broadcom has a mind of its own and is not just a fab contract house as you make it out to be.  Let's say that they have their eyes open and notice that the demand for BCM2835 is huge and that there is zero risk associated with producing devices not to order but for buffer stock.  And let's assume that they did so.

     

    Now, assuming that this happened, what would be the result of Broadcom's sales department picking up the phone and dialing RS's number and saying "Oh RS, guess what, we have the N devices that you wished you had ordered 500 years ago in stock, do you want them?"  (There could even be a small markup over and above contract order pricing.)

     

    Now don't tell me that you think RS would say "Nah, not interested mate.  We're totally happy having our reputation dragged through the mud like it is now thanks, we'll talk to you again in mid-2013 for our next batch."

     

    It would stretch incredulity, so I can't believe that there is any possibility at all of such a response.  RS would love to slash its waiting lists to nil overnight if it would, and it would if given half a chance.  RS would win, Broadcom would win (through slightly more profit for them and a happier Pi ecosystem), and RPF would win massively by Model A not being delayed by the SoC shortage and by being able to strut around with a big smiles on their faces after proclaiming "No more delivery queues anywhere, order freely now."

     

    When everybody would win in this picture, why theorize that Broadcom is totally inept in business and thwarted by some missing paperwork?  It just doesn't make sense.

     

    I'm not often on the side of Broadcom because of their total dislike of openess, but I do believe that they have the business sense to print money when that option is available to them.  And it is.

     

    Morgaine.

     

    If only that was the way fabrication worked!  It certainly would have made my life easier, but alas!  It isn't.  The fabrication people would get beat (sued) to no end if they called up someone and say "hey, your competitor is buying X times the amount you are.  Maybe they know something you don't, would you like to order more?"  That's both bad for business and breaking NDAs.  Now don't get me wrong, you have laid out some mighty fine logic there, extremely well thought out!  But it's obvious you've never worked in a fab plant because you keep talking nonsense in this area (no offense meant, it's just the plain truth).  Now I have real world experience in a fabrication environment, you can keep calling it crazy (which it most certainly is) and trying reject it, but it really is the way these places work! 

     

    It also helps to keep in mind that B-com doesn't care about everyone winning, they care about b-com winning.  And B-com has most certainly won throughout this affair.  More importantly they have to keep winning by keeping their schedules with all their customers.  As crazy successful as the Pi has been, they're just a small part of their big picture their Q4 earnings were 1.82 Billion Dollars.  So far the pi has sold something in the range of .5 Million units (according to Liz's projections).  If they pay 5 dollars per chip that would only represent 2.5 Million, at 10 dollars a pop it would still only be 5 Million, heck if they made $35 of every board it will still only be 17.5 Million dollars in B-com piggy bank or what 1/100th of a percent of their Quarterly income?  B-com has bigger money makers than the pi and their version of winning is making sure that the big income makers stay on schedule.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • jamodio
    jamodio over 13 years ago in reply to morgaine

    The Rpi is like a toy, despite the hype in terms of mass market is in nobody's radar screen, it is still really unclear what's the relationship between RPF and Broadcom besides the intersection with some full time employees contributing to RPF, the agreement between RPF and the manufacturer/distributors is a mistery secret, then in the worst case scenario if demand keeps constant or growing we may have to wait much longer to get a board.

     

    PS. Don't feed the trolls

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • morgaine
    morgaine over 13 years ago in reply to Former Member

    mynameisJim wrote:

     

    It also helps to keep in mind that B-com doesn't care about everyone winning, they care about b-com winning.  And B-com has most certainly won throughout this affair.  More importantly they have to keep winning by keeping their schedules with all their customers.

     

    But that's precisely the point that I've been making all along, that Broadcom has no spare capacity to fabricate more BCM2835 devices!  If you have no spare capacity at the plant then to make more capacity for a particular device would require giving other contract work the boot, and as you say that other contract work almost certainly pays better than the low-margin Pi manufacturers can offer.

     

    So we're actually saying the same thing, in different ways.  The problem is entirely at Broadcom's end through a lack of fab capacity.  The long lead times for BCM2835 result from this total lack of capacity requiring Pi orders to be slotted in after other contracts are fulfilled, which would not happen at all if they had spare capacity.

     

    How can this not be clear?

     

    [Addendum.  Of course this is all speculative since we'll never know what actually happens at Broadcom nor its relationship with its customers, but I'm interested in the core problem that is the root cause of the very long delivery times, and it seems very clear that the core problem is fabrication constraints, not paperwork.  The fact that devices are not available to RS now because an order was not placed many months ago is just a consequence of the lack of fabrication capacity.  The lack of fabrication capacity came first.  You can't blame the lack of fabrication capacity on the lack of an order being placed.  Orders don't create capacity, they just affect the scheduling of different orders in a capacity-limited fabrication plant.]

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • Former Member
    Former Member over 13 years ago in reply to morgaine

    Morgaine Dinova wrote:

     

    mynameisJim wrote:

     

    It also helps to keep in mind that B-com doesn't care about everyone winning, they care about b-com winning.  And B-com has most certainly won throughout this affair.  More importantly they have to keep winning by keeping their schedules with all their customers.

     

    But that's precisely the point that I've been making all along, that Broadcom has no spare capacity to fabricate more BCM2835 devices!  If you have no spare capacity at the plant then to make more capacity for a particular device would require giving other contract work the boot, and as you say that other contract work almost certainly pays better than the low-margin Pi manufacturers can offer.

     

    So we're actually saying the same thing, in different ways.  The problem is entirely at Broadcom's end through a lack of fab capacity.  The long lead times for BCM2835 result from this total lack of capacity requiring Pi orders to be slotted in after other contracts are fulfilled, which would not happen at all if they had spare capacity.

     

    How can this not be clear?

    Because it is ultimately the responsibility of the customer to factor in the lead time for the part and order appropriately.  If RS had ordered a large enough quantity to meet the demand of the device then the lead time wouldn't have mattered.

     

    Now I will make a caveat that the launch debacle (no offense to any R-pi peps) was a failing at all points, but beyond that there should have been some recognition of upcoming demand and ordered appropriately, Fanell did, RS didn't.

     

    I will further add that while we're specifically discussing the RS issue, I'll swing this back round (which is only appropriate since I swung us off course in the first place, lol) to the current issue at hand not enough SoCs for the model A and the Model B (which going back to the original post's link to Liz is actually an issue of we have enough parts to meet the current demand for the model B, but not enough to meet the demand for the B and add the A).  The issue there is also not that B-com can't supply the chip.  They'll supply what ever quantity the customer asks for which brings me right back to my first sentence.  B-com is not responsible for calculating the demand for its customers.  It's their job to meet the request the customer puts in and in the time frame they've been quoted.

     

    We might be arguing semantics at this point, but the crux of what I'm saying is Farnell and RS are the one responsible for ordering enough of the product to last them between productions of the chip, it's not B-coms job to offer more production times (unless demand for the chip exceeds production capacity) nor to keep a large amount of their chip "in stock" to be bought up by the suppliers whenever they want to make more boards than they planned for.   Whereas you are arguing, if I understand your position correctly, that it's entirely b-coms responsibility to offer more production times for the small time chip or bare the responsibility for not producing enough of the chip.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
  • morgaine
    morgaine over 13 years ago in reply to Former Member

    mynameisJim wrote:

     

    Whereas you are arguing, if I understand your position correctly, that it's entirely b-coms responsibility to offer more production times for the small time chip or bare the responsibility for not producing enough of the chip.

     

    I'm not saying either of those things.  I'm saying that the root cause of all the delays is lack of spare capacity at Broadcom, and you've agreed with me but using different words.

     

    However, you prefer to place the blame on RS and somehow twist it to look as if an order placed by RS could magically create new fabrication capacity at Broadcom.  It can't.  At most it can affect scheduling of what is fabricated on capacity-limited equipment so that RS's devices get manufactured before those of another customer.  The restricted fabrication capacity remains restricted though, whether it is producing devices for RS or for someone else.  An order won't bring a new fabrication plant online, that costs billions.  It is accurate to state (assuming of course that our speculation is correct) that Broadcom's lack of spare capacity is the limiting factor.

     

    I am much more interested in technology than in paperwork, and hence blame has to follow root cause.by logical necessity, because the relationship between supply and fulfilled demand is directly causal.  Good timing of order placement can paper over shortages in the same way that a buffer can smooth flow irregularities, but order timing does not have the same causal importance as production capacity.  Indeed, the very need for buffering highlights that the supply is constrained in what it can deliver, so the analogy is apt.

     

    It seems that although we're both blindly examining the same elephant, we're each feeling different parts and so can't agree what on what it looks like.  It's the same elephant though, and it can't stomp out enough BCM2835. image

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
Reply
  • morgaine
    morgaine over 13 years ago in reply to Former Member

    mynameisJim wrote:

     

    Whereas you are arguing, if I understand your position correctly, that it's entirely b-coms responsibility to offer more production times for the small time chip or bare the responsibility for not producing enough of the chip.

     

    I'm not saying either of those things.  I'm saying that the root cause of all the delays is lack of spare capacity at Broadcom, and you've agreed with me but using different words.

     

    However, you prefer to place the blame on RS and somehow twist it to look as if an order placed by RS could magically create new fabrication capacity at Broadcom.  It can't.  At most it can affect scheduling of what is fabricated on capacity-limited equipment so that RS's devices get manufactured before those of another customer.  The restricted fabrication capacity remains restricted though, whether it is producing devices for RS or for someone else.  An order won't bring a new fabrication plant online, that costs billions.  It is accurate to state (assuming of course that our speculation is correct) that Broadcom's lack of spare capacity is the limiting factor.

     

    I am much more interested in technology than in paperwork, and hence blame has to follow root cause.by logical necessity, because the relationship between supply and fulfilled demand is directly causal.  Good timing of order placement can paper over shortages in the same way that a buffer can smooth flow irregularities, but order timing does not have the same causal importance as production capacity.  Indeed, the very need for buffering highlights that the supply is constrained in what it can deliver, so the analogy is apt.

     

    It seems that although we're both blindly examining the same elephant, we're each feeling different parts and so can't agree what on what it looks like.  It's the same elephant though, and it can't stomp out enough BCM2835. image

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
Children
  • Former Member
    Former Member over 13 years ago in reply to morgaine

    Morgaine Dinova wrote:

     

     

    However, you prefer to place the blame on RS and somehow twist it to look as if an order placed by RS could magically create new fabrication capacity at Broadcom.  It can't.  At most it can affect scheduling of what is fabricated on capacity-limited equipment so that RS's devices get manufactured before those of another customer.  The restricted fabrication capacity remains restricted though, whether it is producing devices for RS or for someone else.  An order won't bring a new fabrication plant online, that costs billions.  It is accurate to state (assuming of course that our speculation is correct) that Broadcom's lack of spare capacity is the limiting factor.

     

    Aye yi yi, you just really don't get the way this works do you?  Turns out the explanation I typed up explaining how fab plants worked was far too complicated and long so it got trashed. I'll go from this approach.  RS had problems Farnell didn't.  If they had both had problems and the roku to boot than I'd be with you 100%!  If it worked the way you're suggesting it does than everyone would have issues equally.  Or at best it would rotate as each distributor got their share of limited capacity chip.  First RS would be short on supplies, then Farnell (then Roku).  Since this has obviously has not been the case, and since Billy has enlightened us that B-com is fabless and capacity would not be an issue for a company whose whole business model is getting the chips that have been ordered in the time frame they have been contractually limited to, then all signs indicate that the issue at hand was Farnell ordered enough to meet demand, Roku ordered enough to meet demand, and RS thought the Pi wouldn't be as successful as it has been and ordered a smaller quantity than Farnell.

    • Cancel
    • Vote Up 0 Vote Down
    • Sign in to reply
    • Cancel
element14 Community

element14 is the first online community specifically for engineers. Connect with your peers and get expert answers to your questions.

  • Members
  • Learn
  • Technologies
  • Challenges & Projects
  • Products
  • Store
  • About Us
  • Feedback & Support
  • FAQs
  • Terms of Use
  • Privacy Policy
  • Legal and Copyright Notices
  • Sitemap
  • Cookies

An Avnet Company © 2026 Premier Farnell Limited. All Rights Reserved.

Premier Farnell Ltd, registered in England and Wales (no 00876412), registered office: Farnell House, Forge Lane, Leeds LS12 2NE.

ICP 备案号 10220084.

Follow element14

  • X
  • Facebook
  • linkedin
  • YouTube