The frame is almost completed
I encountered more difficulties than I expected in assembly a structure using steel wires...
It's not very clear in these pictures, but there are three "parallels" corresponding to three "levels"
On the upper level, the raspberry and the accelerometerers will be mounted
The middle level will host the two engines and propellers
The bottom level will host the control surfaces
At the bottom of the sphere (so outside the sphere) I will place the battery and the two servos that move the control surfaces


Top Comments
-
ravi_butani
-
Cancel
-
Vote Up
0
Vote Down
-
-
Sign in to reply
-
More
-
Cancel
-
balearicdynamics
in reply to ravi_butani
-
Cancel
-
Vote Up
0
Vote Down
-
-
Sign in to reply
-
More
-
Cancel
-
ravi_butani
in reply to balearicdynamics
-
Cancel
-
Vote Up
0
Vote Down
-
-
Sign in to reply
-
More
-
Cancel
-
balearicdynamics
in reply to ravi_butani
-
Cancel
-
Vote Up
0
Vote Down
-
-
Sign in to reply
-
More
-
Cancel
Comment-
balearicdynamics
in reply to ravi_butani
-
Cancel
-
Vote Up
0
Vote Down
-
-
Sign in to reply
-
More
-
Cancel
Children