LS,
Is there a thumbs rule connecting two layers.
On the bottom and on the top layer I have a GND polygon.
To reduce stray current I would like to connect these two using via's.
Regards
Harry
LS,
Is there a thumbs rule connecting two layers.
On the bottom and on the top layer I have a GND polygon.
To reduce stray current I would like to connect these two using via's.
Regards
Harry
Oh yeah, if you are thinking that knowing the voltage drop is important,
it may not be. If you plan on using that ground plane as a voltage
reference you should just run parallel ground traces that don't carry
current to anyplace that needs to know ground voltage (like an opamp
input or voltage regulator). These are separate from the plane returning
current to ground potential and generating voltage drops.
Oh yeah, if you are thinking that knowing the voltage drop is important,
it may not be. If you plan on using that ground plane as a voltage
reference you should just run parallel ground traces that don't carry
current to anyplace that needs to know ground voltage (like an opamp
input or voltage regulator). These are separate from the plane returning
current to ground potential and generating voltage drops.