The In The Air Challenge is running from September 22nd to February 27th.
Previous Activity:
Blog Summary #000 : In The Air Challenge 2014
Blog Summary #001 : In The Air Challenge 2014
Blog Summary #002 : In The Air Challenge 2014
Blog Summary #003 : In The Air Challenge 2014
Blog Summary #004 : In The Air Challenge 2014
Current Activity:
Blog Summary #006 : In The Air Challenge 2014
Blog Summary #007 : In The Air Challenge 2014
Blog Summary #008 : In The Air Challenge 2014 - Final
| Name | Super Awesome Blog Time |
|---|---|
| janisalnis | No Updates |
| dimonic | No Updates |
| ravi_butani | No Updates |
| xever | Carbon Footprint Monitoring - Printed Circuit Boards |
| amgalbu | AirMobile - 14 - Bluetooth module AirMobile - 15 - RAM Execution |
| tomaja | In the Air Design Challenge - Pollen & Allergen Sensing – Post 5 (InTheAir Power Board) In the Air Design Challenge - Pollen & Allergen Sensing – Post 6 (HDC1000 Sensor) |
| clk | No Updates |
| rmlab | No Updates |
| nikil511 | |
| ipv1 | No Updates |
| engswee | No Updates |
| happy1 | |
| fvan | |
| dwinhold | |
| michaelwylie | |
-
ravi_butani
-
Cancel
-
Vote Up
0
Vote Down
-
-
Sign in to reply
-
More
-
Cancel
-
cstanton
in reply to ravi_butani
-
Cancel
-
Vote Up
0
Vote Down
-
-
Sign in to reply
-
More
-
Cancel
Comment-
cstanton
in reply to ravi_butani
-
Cancel
-
Vote Up
0
Vote Down
-
-
Sign in to reply
-
More
-
Cancel
Children